Ontario Power Generation, Pickering

Traditional control panel—Hired to design the control panel of the Auxiliary Power System (APS) for OPG’s Pickering reactors. The APS was a different generation of technology, which had to fit in with the traditional system and procedures. The biggest challenge turned out to be education and buy-in to a new technology controlled with older manual switches and meters. After validation by licensed operator, it proved very effective and went on to CNSC approval.

– Bruce Power, Ontario, Periodic Safety Review (PSR)

Responsible for the Human Factors portion of the International Atomic Energy Agency mandated review, in accordance with Safety Standards Series No. NS-G-2.10.

Adventis Staffing Enhanced Human Factors